(+237) 222 313 464 / 696 883 796
solarhydrowatt@gmail.com
Mendong Market, Street 7.751, P.O.Box : 7048 Yaounde /span>

References

Sponsor Project Location Goals Period
MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENT Electrification of Fotetsa by a hybrid hydro solar system Fotetsa, Menoua Division, West Region, Cameroon
  • construct a medium head micro hydropower plant of 120 kW;
  • Build a 15 kWp photovoltaic solar power plant;
  • Make a pilot hybrid hydropower and photovoltaic system;
  • Build the distribution network, connections, metering and interior equipment;
  • Assist the Council in the operation of the scheme.
In progress (signing of the contract on March 11,2020)
SONATREL Rural electrification and energy access project in the northern Regions (more than 800 localities)

In consortium Artelia, Genex and Ere-developpement
Adamawa,North and Far North
  • Collect all the physical, technical and socio-economic data necessary for carrying out pre-feasibility studies;
  • Perform prefeasibility studies;
  • Perform feasibility studies and tender documents for the recruitment of construction companies.
2020-2022.
Council of Dschang, Nantes Métropole, French Agency of Development Project management of the construction works of the micro-hydropower plants of Lingang-Foto and Lefock. Lingang and Lefock, Menoua Division, West Region, Cameroon
  • Direction of the Execution of Works Contracts;
  • Control of the Conformity of Achievements;
  • Design and approval of the execution plans of the works proposed by the companies (civil engineering lot and electrical network construction lot);
  • Assistance to Reception Operations and Reports.
In progress since April 2020
European Union Hydropower Solutions for developing and emerging countries (HYPOSO).
In consortium With Wirtschaft Und Infrastruktur Gmbh & co, European Renewable Energies Federation, Aleksandro Stulginskio Universitas, Stiching Ihe Delft Institute for Water, Studio Frosio S.r.l,Trmew Sp. Z O.o, Instytut Masyn Przeplywowyc, Centro Latinoamerica no Para La, Hydropower Association Of Uganda Ltd., Escuela Politecnica Nacional, Universidad Mayor De San Simon, 1to3 Capital Bv
Belgium, Denmark, Lithuania, Nederland, Austria, Poland, Bolivia, Colombia, Ecuador,Uganda and Cameroon
  • framework analyses with regard to small hydropower up to 30 MW for selected target countries (Bolivia, Cameroon, Colombia, Ecuador and Uganda);
  • – mapping of more than 2,000 potential hydropower sites in the target countries with a geo information system (GIS) mapping tool;
  • capacity building – development of a Knowledge and Capacity Development (KCD) tool for capacity building of local stakeholders (i.e. hydropower professionals – young and senior, political deciders)
  • in cooperation with local experts and political stakeholders, elaboration of 15 dedicated business case studies of SHP projects (three in each of the five target countries) with a focus on local financing, leading to at least 5 signed Memorandum of Understanding (MoU) between stakeholders from target countries and the European hydropower sector.
  • Leaflet: A leaflet will be provided to give you information about the HYPOSO project in a nutshell.
  • Video material
In progress since October 2019
CEGELEC Cameroon Contract for subcontracting work on the maintenance of intersections with operational traffic lights, but also the rehabilitation of intersections and the programming of traffic lights. Yaoundé, Cameroon Measurement of earth, calibration, sinking, civil engineering, PLC programming, installation, installation of posts and fire blocks. September 2015 – May 2017
CEGELEC Cameroon Letter of command for the task of insuring the control of the rehabilitation and maintenance works for the faux-tricolores for the lot N ° 02 whose main missions were the following:

  • Review of project compliance and completion of execution studies;
  • Department for the execution of works contracts, scheduling, piloting and coordination of construction sites;
  • Support during receiving operations and during the warranty period.
Yaoundé, Cameroon
  • Verification and validation of execution files and determination of planned calendars;
  • Organization of weekly site meetings, construction site logs, development of various findings and minutes;
  • Drafting of the various reports and monitoring of administrative documents and settlement elements;
  • Organization of job acceptance operations.
August 2015 – August 2017
Rural Electrification Agency (REA) Public procurement for the development of the hydroelectric potential of the “Edje” and “Miene” watercourses in Lomié in the Eastern Region of Cameroon for an estimated capacity of 5 MW .
In consortium with BG Ingénieurs Conseils Suisse
Lomié, Eastern Cameroon region Hydrological, Topographic, Hydraulic, Hydromechanical, Electrical, Environmental Impact and Financial Analysis January – June 2016
ADEID (Action for Integrated and Sustainable Equitable Development) Developping renewable ressources for poverty alleviation in the rural areas of Bare Bakem, Kekem, Foumbot, and Massangam. Koutaba – Foumbot – Massangam – Baré – Bakem, West, Cameroon Technical, economic, financial, environmental and project cost studies. April – June 2013
CEGELEC Cameroon Contract for subcontracting work on the maintenance of intersections with operational traffic lights, but also the rehabilitation of intersections and the programming of traffic lights. Yaoundé, Cameroon Measurement of earth, calibration, sinking, civil engineering, PLC programming, installation, installation of posts and fire blocks. September 2012 – June 2015

Our partners